";document.getElementsByTagName("head")[0].appendChild(htmlDiv.childNodes[0]);}

Minnygap Wind Farm Enabling Works

Dates: Oct 2015 – Feb 2016

Main contractor for the enabling works required prior to the construction of Minnygap wind farm. The works included various corner widenings on 5km of existing forestry track, 300m of new access track through a recently felled area and the construction of a culvert crossing a protected watercourse.

Categories
WordPress Theme built by Shufflehound. © Jacks 1 Civil Engineering Ltd. 2001-2022. All rights reserved.