";document.getElementsByTagName("head")[0].appendChild(htmlDiv.childNodes[0]);}

Ingliston Park & Ride – Drainage and Attenuation

Main Contractor: I&H Brown

Dates: July 2020 – September 2020

Description: Drainage alterations and install of two attenuation tanks at Ingliston Park & Ride in Edinburgh. Works involved install of new drainage to connect the new attenuation tanks to the existing system, all groundworks and install of tanks, outfall and swale alteration works for new run off.

WordPress Theme built by Shufflehound. © Jacks 1 Civil Engineering Ltd. 2001-2022. All rights reserved.